Sothern Methodist University

LOCATION: Dallas, TX. MARKET: Collegiate Sports
Southern Methodist University

Project Overview

Southern Methodist University’s move to the Atlantic Coast Conference includes it’s SMPTE 2110 System Broadcast Production facility. This new system will offer enhanced capabilities for live broadcasts, digital content creation and live broadcasts. The massive project included 4 separate controls rooms, including Gerald J. Ford Stadium (Football Stadium), Moody Coliseum (Basketball & Volleyball), Washburn (Soccer & Track), and Robson & Lindley Aquatics Center. Clark Wire & Cable was thrilled to be able to provide the Cable, enclosures and custom panels for this project.

Custom designed and built panels and angled SMPTE splice enclosures, plenum rated Cat6, Single Pair Audio, RG58 Indoor/Outdoor DBR series cables including audio snake cables, fiber, coax, cat6 cable 3 channel SMPTE cable, 12-strand, 6-strand indoor/outdoor interlocking armored finer cable.
  • A three-story, 192,500-square-foot structure in the south end zone.
  • Luxury suites, field-level suites, two new video boards.

  • 24 & 48 strand fiber
  • Armored Fiber Optic Cable

  • Multi-Pair Audio Cables
  • Single-Pair Audio Cables - plenum rated

  • Coaxial Cables
  • RG58
  • Direct burial, riser rated